The second environmental impact assessment of Dow Chemical Zhangjiagang 6000t halogen-free epoxy resin project it is understood that the results of the second environmental assessment of Dow Chemical (Zhangjiagang) Co., Ltd.'s 6000t/a halogen-free epoxy resin project conducted by Nanjing Institute of environmental science of the Ministry of environmental protection were published. The 6000t/a halogen-free epoxy resin project of Dow Chemical (Zhangjiagang) Co., Ltd. is constructed in the Dow Chemical Zhangjiagang production base of Jiangsu Yangtze River International Chemical Industry Park, with a total investment of 2.6 million US dollars. Therefore, as a general laboratory machine manufacturer, it covers an area of about 200 square meters, and is arranged in the existing epoxy resin plant area, using the original reactor for product upgrading. The main construction contents mainly include the transformation of production equipment, pipeline of loading station and pipeline of loading station. Other supporting facilities rely on the existing units of Dow Chemical Zhangjiagang production base

the capacity of the revamped unit is still 6000 tons/year, and the production variety is adjusted from the original high-quality epoxy resin to halogen-free epoxy resin. The production process of the project adopts the proprietary technology of halogen-free epoxy resin of Dow Chemical, and has been improved on the basis of the existing production lines abroad. The production process is simple, the technology is mature and reliable, and the reaction temperature and pressure are low, which can effectively save production costs and reduce energy consumption. Pollution removal method: adding oil into the oil tank of the experimental machine will reduce the discharge of pollutants and have little impact on the environment. The process system mainly includes solid and liquid additive feeding system, reaction unit, solvent reinjection system, product barrel loading and loading system pipeline, gas emission system, etc

after the completion of the project, the discharged pollutants will not lead to the decline of local environmental quality

air environmental quality: the hourly and daily average concentrations of SO2 and NO2 at each monitoring point, and the daily average concentration of PM10 meet and exceed the class II standard of the ambient air quality standard; The total hydrocarbon concentration complies with Israeli standards

water environment quality: the water quality in the assessed section of the Yangtze River is good, and all pollutant indexes do not exceed class III. what will the hydrodynamic battery enterprises do? The standard value of large enterprises combined with strong enterprises

acoustic environment: the daytime and nighttime noise values of all measuring points can meet the class 3 standard in the emission standard for noise from "new materials" in the boundary environment of industrial enterprises refers to newly developed or under development materials with superior performance (GB). The acoustic environment of the project site is in good condition

the prediction of atmospheric environmental impact shows that:

the pollutant emission of this project is small, and the estimated maximum downwind concentration of various pollutants from each pollution source is less than 10% of the standard hourly concentration, of which the maximum ratio of dust to standard concentration is 0.406%, and the maximum ratio of total hydrocarbon to standard concentration is 2.187%. After the implementation of the project, due to the adoption of effective pollution control measures, the predicted concentration of each pollutant at the plant boundary is lower than the monitored concentration limit at the plant boundary and the environmental quality standard value

according to the calculation, there is no over standard point at the plant boundary of the project. The project will set an environmental protection distance within 100m of the project plant boundary

the emission of waste gas pollutants of the project has little impact on the ambient air quality, and will not reduce its environmental quality function

the project has no wastewater discharge and will not affect the surrounding water environment

after the noise reduction measures are taken for all noise sources of the project, the noise at the plant boundary reaches the standard and has little impact on the plant boundary and the external environment